MCF-STO-017 Checkpoint Durability
Claim effectivenessAssurance level AL5Tier CP-5Evidence floor S4Critical to CG-08Supports CG-10
Objective. Ensure each checkpoint is complete, consistent across all shards and ranks, durably committed and verifiable before it is marked good and before older checkpoints are deleted.
Requirement and evidence
The AI platform operator shall mark a checkpoint good only after all shards are written, flushed to durable storage, checksummed and manifest-recorded; shall never delete the previous good checkpoint until the new one is verified; and shall retain the declared number of good checkpoints. The storage service owner shall ensure the checkpoint tier honours flush semantics.
Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E1, E5. Operating states: NORMAL, DEGRADED, FAILED, RECOVERY.
MCF-STO-018 Restart Readiness
Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-10
Objective. Ensure a training or fine-tuning job can be restarted from its latest good checkpoint on available capacity (including a different set of nodes or a reduced node count where the framework supports re-sharding) within the declared restart time objective.
Requirement and evidence
The AI platform operator shall maintain restart procedures and automation for production job classes, shall verify that checkpoints can be loaded on a different node set, shall measure time from failure to resumed training, and shall exercise restart at a defined interval including after a storage or facility event.
Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: RECOVERY, FAILED, DEGRADED.
MCF-STO-019 Storage Recovery Sequencing
Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Supports CG-10, CG-09
Objective. Ensure that after a site, power or cooling event, storage services are brought back in a defined order (power and cooling verified, network and time, identity, metadata services, data servers, consistency checks, client mounts, then job readmission) so that recovery does not corrupt data or stall on hidden dependencies.
Requirement and evidence
The storage service owner shall maintain a storage recovery sequence with prerequisites, hold points and verification checks for each step, aligned with facility (THM/POW) and compute (CMP) recovery, and shall exercise it at a defined interval.
Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E6. Operating states: RECOVERY, FAILED, SHUTDOWN.
MCF-STO-020 Recovery Validation
Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-10
Objective. Demonstrate by periodic restore tests that every protected data class can be restored from each protection mechanism (snapshot, replica, immutable copy) to a usable, integrity-verified state within the declared recovery time, and that restored checkpoints actually resume training.
Requirement and evidence
The storage service owner shall run restore tests at a defined interval for each protected data class and protection mechanism, shall verify integrity of restored data by checksum, and, for checkpoints, the AI platform operator shall resume a training job from the restored checkpoint and confirm loss and step continuity.
Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: RECOVERY, NORMAL.