OPS Building Operations and Service Management

6 families and 24 controls. Critical to CG-04 Life safety and hazardous energy, CG-07 Critical control-system integrity, CG-13 Responsibility and authority, CG-14 Change control.

OPS domain guideSee it in the explorer

Proposed text. Requirements are from registry v1.1 (status CANDIDATE), proposed under amendment AMD-002. Intervals and thresholds are set by the assessed organisation in its capability profile. The approved v1.0 baseline uses the same identifiers.

24 controls

OPS-01 Operating model and staffing

MCF-OPS-001 24x7 Coverage

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-13, CG-10

Objective. Competent and authorised staff are present or available within response time, every hour of every day, in the numbers and disciplines needed to perform the time-critical tasks of the emergency procedures within the time-to-impact of the failures they address.

Requirement and evidence

The operations manager shall define minimum staffing per shift and per discipline (electrical, mechanical/thermal, controls/BMS, NOC/IT infrastructure, security) derived from an emergency task analysis that lists the time-critical manual actions in each EOP (for example manual generator start or transfer, CDU failover, leak isolation, load shedding) and compares their completion time with the time-to-impact from MCF-DEP-003. The operations manager shall roster to that minimum, record every shift that falls below it and the compensating measures, and shall define on-call response times for specialists not on site.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, EMERGENCY, MAINTENANCE.

MCF-OPS-002 Role Clarity

Claim implementationAssurance level AL3Tier CP-2Evidence floor S3Critical to CG-13Supports CG-14

Objective. For every Required Function, dependency and operating state, it is clear who operates, who maintains, who monitors, who may approve change, who responds to alarms and who holds emergency decision authority, including across facilities, IT/NOC, tenant and provider teams.

Requirement and evidence

The operations manager shall maintain a responsibility and authority matrix for every Required Function and material dependency across NORMAL, MAINTENANCE, EMERGENCY and RECOVERY states, naming the role and current holder (and deputy) for operation, maintenance, monitoring, change approval, alarm response and emergency decisions (for example authority to transfer to generator, shed load, power-cap or drain a cluster, isolate a cooling loop, or invoke an EOP). The matrix shall be consistent with GOV-02 accountability and with provider shared-responsibility records (MCF-DEP-018).

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state. Optional: E3, E4, E5. Operating states: NORMAL, MAINTENANCE, EMERGENCY, RECOVERY.

MCF-OPS-003 Shift Handover

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-04, CG-14

Objective. Situational awareness is transferred completely at every shift change: plant and system state, active alarms, open permits and isolations, temporary configurations, deferred maintenance, degraded redundancy, in-progress work and expected events.

Requirement and evidence

The shift lead shall conduct and record a structured handover at each shift change using a defined template covering: current operating state per system and redundancy level, active and standing alarms, open permits to work and isolations, temporary configurations and overrides, work in progress and planned work, deferred maintenance with risk, provider or tenant events, and expected events (deliveries, tests, high-load periods). Outgoing and incoming leads shall both sign, and the incoming lead shall verify critical items at the BMS/EPMS/NOC consoles.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE, DEGRADED.

MCF-OPS-004 Competence and Authorisation

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-04Supports CG-13

Objective. Only people assessed as competent, and formally authorised for the task and system, perform hazardous or consequential work, including HV/LV switching, work on battery systems, liquid-cooling and pressurised fluid systems, refrigerants, and control-system changes.

Requirement and evidence

The operations manager shall maintain a competence framework defining required knowledge, skills and assessment for each task class, and an authorisation register recording each person's authorisations (for example authorised person and competent person for HV/LV systems, refrigerant handling certification where legally required, liquid-cooling and CDU work, BMS/EPMS engineering), their scope, expiry and assessor. The operations manager shall verify contractor competence and authorisation before work and shall ensure permits (MCF-OPS-007) are issued only to authorised persons.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE, EMERGENCY.

OPS-02 Procedure and work control

MCF-OPS-005 Standard Operating Procedures

Claim implementationAssurance level AL3Tier CP-2Evidence floor S3Supports CG-10, CG-13, CG-14

Objective. Routine, alarm-response and emergency operations on critical infrastructure are performed from controlled, technically reviewed and current procedures (SOPs, alarm response procedures, EOPs) that match the as-built systems and are available at the point of use.

Requirement and evidence

The operations manager shall maintain a controlled procedure set comprising SOPs for routine operation, alarm response procedures for critical alarms, and EOPs for each credible emergency scenario (including utility loss, generator failure to start, UPS failure, cooling loss at sustained AI load, CDU or secondary-loop failure, liquid leak, fire alarm and suppression interfaces, BMS/EPMS loss, and loss of NOC). Each procedure shall have an owner, technical reviewer, version and review date, shall be validated against the as-built system by walkthrough before issue, and shall be available at the point of use including when the BMS and IT systems are unavailable.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state. Optional: E3, E4, E5. Operating states: NORMAL, MAINTENANCE, EMERGENCY, RECOVERY.

MCF-OPS-006 Method Statements

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-14Supports CG-04

Objective. Non-routine work on critical infrastructure is executed from a task-specific method of procedure (MOP) that states the exact steps, hold points, isolation points, expected readings, redundancy exposure during the work, and back-out steps, so that maintenance and change do not cause outages.

Requirement and evidence

The maintenance manager shall require an approved MOP for every non-routine task on critical infrastructure, including: scope and affected assets; the operating state and redundancy level during each step (for example N during work on one of N+1 UPS modules); preconditions (for example job checkpoint or workload drain agreed with the platform owner, spare on hand, weather); step-by-step actions with hold points and expected indications; isolation and LOTO points; back-out steps; communications plan; and approvals by engineering, operations and change control (MCF-OPS-018). The MOP shall be executed as written with each step signed off and deviations stopped and escalated.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: MAINTENANCE, TRANSITION.

MCF-OPS-007 Permit to Work

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-04

Objective. Hazardous work is authorised, controlled, coordinated and handed back through a permit-to-work system so that hazardous energy, fluids, confined spaces, hot work and work at height are controlled and conflicting work is prevented.

Requirement and evidence

The facility operator shall operate a permit-to-work system for hazardous work, including electrical (HV and LV), battery and DC systems, hot work, confined spaces (for example tanks, pits, trenches, plenums), work at height, pressurised and liquid-cooling systems, refrigerants and fire-suppression systems. Each permit shall identify the work, hazards, isolations (cross-referenced to LOTO), precautions, issuer and receiver (both authorised under MCF-OPS-004), validity period, and cross-references to other live permits in the same system. Permits shall be suspended at shift change unless re-validated, and closed only after hand-back confirms the system is safe to return to service.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: MAINTENANCE, EMERGENCY, NORMAL.

MCF-OPS-008 Lockout and Tagout

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-04

Objective. All hazardous energy sources (electrical including back-feeds and DC/battery sources, stored energy in capacitors and UPS, mechanical, hydraulic and pneumatic, pressurised coolant, thermal) are isolated, locked, tagged and proven dead or depressurised before work, and restored only under control.

Requirement and evidence

The facility operator shall define LOTO procedures for each equipment class that identify every energy source (including generator, UPS and battery back-feeds, BESS, capacitors, CDU pumps, pressurised secondary loops and facility water), the isolation points, locking devices, and the method to prove isolation (test-before-touch with a proven tester, pressure and temperature verification). Each worker shall apply a personal lock, group lockboxes shall be used for multi-worker jobs, and restoration shall follow a verified sequence. The facility operator shall audit LOTO practice at the profile interval.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: MAINTENANCE, EMERGENCY.

OPS-03 Maintenance and reliability

MCF-OPS-009 Maintenance Strategy

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-05, CG-06

Objective. Each critical asset class has a maintenance strategy (preventive, predictive, condition-based or run-to-failure) justified by its failure modes and consequence, aligned with OEM requirements and recognised practice, and executable without exceeding the redundancy available in the MAINTENANCE state.

Requirement and evidence

The maintenance manager shall define and approve a maintenance strategy for each critical asset class (including MV/LV switchgear and protection, transformers, UPS and batteries, generators and fuel systems, busways and PDUs, chillers, CRAH/fan walls, CDUs and secondary loops, pumps, cooling towers or dry coolers, BMS/EPMS, fire detection and suppression, and IT infrastructure hardware) stating tasks, intervals, basis (OEM, recognised practice, reliability analysis), and the operating state and redundancy level during each task. The capability owner shall confirm that each maintenance configuration leaves capacity sufficient for the declared load, or that maintenance windows are coordinated with workload reduction.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E3, E4, E5. Operating states: MAINTENANCE, NORMAL.

MCF-OPS-010 Condition Monitoring

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-05, CG-06

Objective. Deterioration of critical assets is detected before functional failure through defined condition-monitoring techniques with thresholds and actions.

Requirement and evidence

The maintenance manager shall operate condition monitoring for critical assets using techniques appropriate to their failure modes, for example infrared thermography of electrical connections, partial discharge monitoring on MV equipment, dissolved gas and oil analysis on transformers, battery impedance or conductance and temperature monitoring, vibration analysis on pumps, fans and chillers, coolant quality monitoring (conductivity, pH, inhibitor and biocide levels, particulates) on liquid-cooling loops, and filter differential pressure. Each technique shall have defined thresholds and response actions, and exceedances shall generate work orders.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE.

MCF-OPS-011 Calibration

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-07

Objective. Instruments whose readings drive control, protection, alarming, billing or assurance decisions (temperature, pressure, flow, leak, power and energy meters, CTs/VTs, protection relays, gas detectors, and the test instruments used by technicians) are calibrated to traceable standards at defined intervals, so that control loops and evidence are trustworthy.

Requirement and evidence

The maintenance manager shall maintain a calibration register for critical instruments, including sensors used in BMS/EPMS/CDU control loops and alarms, protection relays (secondary injection testing), revenue and sub-meters, leak detection, and portable test equipment, stating interval, method, traceability and tolerance. Out-of-tolerance results shall trigger an impact assessment of decisions and evidence that relied on the instrument since its last good calibration.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE.

MCF-OPS-012 Deferred Maintenance

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-05, CG-06, CG-13

Objective. Maintenance that is deferred, overdue or cancelled is visible, risk-assessed, approved by someone with authority, time-limited and reflected in the declared operating state, so that the accumulated risk of deferral does not silently erode resilience.

Requirement and evidence

The maintenance manager shall record every deferral or overdue item of maintenance on critical assets in a deferred maintenance register with reason, risk assessment, compensating measures, approver with authority, and expiry date. Deferrals beyond the profile limit shall require re-approval by the accountable owner. Deferred safety-critical maintenance shall be reflected in the operating state (for example the system declared DEGRADED) and in handover (MCF-OPS-003).

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, DEGRADED, MAINTENANCE.

OPS-04 Alarm, incident and problem management

MCF-OPS-013 Alarm Rationalisation

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-07Supports CG-06, CG-05

Objective. Alarms from BMS, EPMS, CDU, fire, leak detection, security and NOC systems are rationalised so that every alarm is meaningful, prioritised by consequence and time to respond, has a defined response, and the alarm load on operators remains manageable in normal and upset conditions.

Requirement and evidence

The control-system owner shall maintain an alarm philosophy and master alarm database for in-scope monitoring systems in which each alarm has a documented cause, consequence, priority (derived from consequence and time-to-impact per MCF-DEP-003), setpoint basis, and response procedure. The control-system owner shall measure alarm performance (alarm rates per operator in normal and upset conditions, standing alarms, chattering alarms, shelved or suppressed alarms) at the profile interval, act on exceedances, and control alarm suppression and shelving through MCF-OPS-019.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, DEGRADED, EMERGENCY.

MCF-OPS-014 Incident Response

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-10, CG-13

Objective. Incidents affecting infrastructure or Service Outcomes are detected, classified by outcome impact, escalated, coordinated across facilities, NOC, platform, tenant and provider teams, and stabilised within defined timescales.

Requirement and evidence

The operations manager shall operate an incident management process that classifies incidents by Service Outcome impact and safety, defines escalation timescales and authorities, establishes a joint bridge between facilities, NOC, platform and provider teams for cross-domain incidents, links to EOPs and to RES-06 crisis command, records a timeline, and requires a post-incident review for incidents above the profile threshold.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: DEGRADED, EMERGENCY, RECOVERY.

MCF-OPS-015 Root Cause Analysis

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-09

Objective. Significant incidents and near misses are analysed to their root and contributing causes, including latent design, organisational and human-factors causes, so that corrective actions address causes rather than symptoms.

Requirement and evidence

The operations manager shall require a root cause analysis using a recognised method for each incident or near miss above the profile threshold, completed within the profile time, identifying direct, contributing and root causes (including procedure, competence, alarm, design, supplier and organisational factors), propagation beyond expected containment, and corrective and preventive actions with owners. RCAs of provider-caused events shall be obtained from the provider and assessed.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, RECOVERY.

MCF-OPS-016 Problem Elimination

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Supports CG-14

Objective. Corrective and preventive actions from incidents, RCAs, audits and trends are implemented and verified to have eliminated or reduced recurrence, and known errors are managed until fixed.

Requirement and evidence

The operations manager shall track problems and corrective/preventive actions to closure, shall verify effectiveness of closed actions by evidence that the failure mode has not recurred over a defined period or by test, shall maintain a known-error record with workarounds for unresolved problems, and shall review recurrence trends at the profile interval.

Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E6, E7. Operating states: NORMAL.

OPS-05 Change and configuration management

MCF-OPS-017 Configuration Baseline

Claim implementationAssurance level AL3Tier CP-2Evidence floor S4Critical to CG-14Supports CG-02, CG-07

Objective. An authoritative, current baseline exists for the configuration of facility and AI infrastructure that matters to Required Functions, so that changes can be assessed against it, drift detected and known-good states restored.

Requirement and evidence

The configuration manager shall maintain an approved configuration baseline covering, at minimum: as-built single-line diagrams and P&IDs; protection settings and coordination study revision; BMS/EPMS/CDU setpoints, sequences of operation and PLC logic versions; UPS, ATS and PDU settings; firmware and software versions of facility and IT infrastructure; network and fabric configurations; storage and cluster-manager configuration. The baseline shall be versioned, access-controlled, reconciled to the live state at the profile interval and after each change, and backed up outside the fault domain it describes.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state. Optional: E3, E4, E5. Operating states: NORMAL, MAINTENANCE, RECOVERY.

MCF-OPS-018 Change Assessment

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Critical to CG-14Supports CG-03

Objective. Every change to critical facility or AI infrastructure is classified, impact-assessed against the dependency graph, fault domains and redundancy, scheduled in coordination with workloads, and approved by people with authority across facilities and IT before implementation.

Requirement and evidence

The change manager shall operate a change process that requires, for each change to in-scope infrastructure: classification (standard, normal, emergency) with criteria; impact assessment that identifies affected Required Functions using the asset-to-function and dependency maps, redundancy and fault-domain exposure during the change, safety implications, and workload coordination (for example checkpoint or drain); a linked MOP for non-routine work; approval by a change authority with both facilities and IT representation for cross-domain changes; and conflict checking against other scheduled changes and maintenance. Emergency changes shall be retrospectively reviewed.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: MAINTENANCE, TRANSITION, NORMAL.

MCF-OPS-019 Temporary Configuration

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-14, CG-07, CG-04

Objective. Temporary configurations (bypasses, jumpers, forced points, overrides, manual mode on automatic systems, inhibited or shelved alarms, temporary chillers or generators, load banks, temporary cabling and hoses) are approved, registered, time-limited, visible to operators and removed with verification.

Requirement and evidence

The shift lead shall record every temporary configuration of critical infrastructure in a temporary configuration register with description, reason, risk assessment, approver, expiry, compensating measures and removal verification. Temporary configurations shall be visible at the operator console where technically possible, included in handover, reviewed at each expiry, and any extension shall be re-approved. Safety-system overrides (fire, leak, gas detection, emergency power off) shall require approval at the level set in the capability profile.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: MAINTENANCE, DEGRADED, EMERGENCY, NORMAL.

MCF-OPS-020 Rollback and Validation

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Critical to CG-14Supports CG-10

Objective. Each material change can be reversed to a known-good state when it fails, and its success is validated by defined post-change tests and observation before the change is closed and redundancy is declared restored.

Requirement and evidence

The change manager shall require each material change to define back-out criteria, a back-out procedure tested or rehearsed where practicable, and post-change validation (functional checks, telemetry review, alarm review, redundancy restoration check, and for IT infrastructure job or health checks) with evidence attached before closure. Failed validations shall trigger back-out or an incident, and post-implementation review shall be held for failed or backed-out changes.

Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E6, E7. Operating states: MAINTENANCE, TRANSITION, NORMAL.

OPS-06 Capacity and service operations

MCF-OPS-021 Capacity Review

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-05, CG-06

Objective. Power, cooling, space, network and contracted utility capacity is reviewed against measured demand and committed growth, by operating state, so that new deployments are admitted only where capacity including maintenance and failure states is available.

Requirement and evidence

The capacity manager shall review at the profile interval rated, available, reserved, consumed and headroom capacity for each capacity-bearing element (utility contract, transformers, UPS systems, busways and PDUs, generator capacity, chiller and heat-rejection plant, CDU and secondary loops, air cooling, floor loading, network ports and optics), considering N and N-1 (maintenance) states and transient AI load behaviour (for example synchronous training power swings). New deployments shall pass a capacity admission check against these values before installation.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE.

MCF-OPS-022 Service Level Monitoring

Claim operationAssurance level AL4Tier CP-3Evidence floor S4

Objective. Service Outcome indicators (for example accelerator availability per partition, job interruption rate attributable to infrastructure, inference latency and availability, environmental envelope compliance at the IT inlet or coolant supply, power and cooling availability to tenants) are measured accurately and visibly to the NOC and BMS operators.

Requirement and evidence

The operations manager shall define and measure indicators for each Service Outcome, with measurement method, source, and data quality checks, shall display them to NOC and BMS operators in an integrated view, and shall report performance against tolerance at the profile interval.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, DEGRADED.

MCF-OPS-023 Resource Balancing

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-05, CG-06, CG-09

Objective. Load is placed and balanced across phases, PDUs, UPS modules, busways, CDU loops and rows so that no element exceeds its rating in N or N-1 states, capacity is not stranded, and AI workload controls (power capping, placement constraints) are coordinated with facility limits.

Requirement and evidence

The capacity manager shall define placement rules and balance limits (phase imbalance, per-PDU and per-UPS load, per-CDU flow and heat load) for in-scope infrastructure, shall monitor balance continuously or at the profile interval, and shall coordinate with the platform owner on workload controls (scheduler placement, power capping) so that facility limits are respected. Imbalance or exceedance shall be corrected through change control.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL, MAINTENANCE.

MCF-OPS-024 Operational Reporting

Claim operationAssurance level AL4Tier CP-3Evidence floor S4Supports CG-13

Objective. Accountable owners receive accurate, traceable periodic reports on operational risk and performance (incidents and near misses, Service Outcome performance, capacity headroom, deferred maintenance, temporary configurations, open findings and actions, staffing shortfalls, supplier performance) on which they can make decisions.

Requirement and evidence

The operations manager shall issue operational reports to accountable owners at the profile interval containing the listed indicators with data sources and lineage, trends and exceptions, and shall record decisions or actions arising.

Evidence required: E2 Configuration and technical state; E3 Operational and observational. Optional: E4, E5, E6. Operating states: NORMAL.