RES Resilience, Continuity and Recovery

6 families and 24 controls. Critical to CG-09 Failure containment, CG-10 Recovery readiness.

RES domain guideSee it in the explorer

Proposed text. Requirements are from registry v1.1 (status CANDIDATE), proposed under amendment AMD-002. Intervals and thresholds are set by the assessed organisation in its capability profile. The approved v1.0 baseline uses the same identifiers.

24 controls

RES-01 Resilience strategy

MCF-RES-001 Minimum Service Outcome

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-01, CG-10, CG-09

Objective. Ensure every in-scope Capability Instance has a defined minimum service outcome and impact tolerance (maximum tolerable disruption, minimum capacity, maximum lost work, maximum data loss) that resilience design, testing and recovery claims can be measured against.

Requirement and evidence

The capability owner shall define and approve, for each in-scope Capability Instance, the minimum service outcome to be sustained under DEGRADED and EMERGENCY states and the impact tolerance, expressed as maximum tolerable duration of disruption, minimum retained capacity (for example accelerator-hours or tokens per second), maximum tolerable lost training progress, recovery time and recovery point objectives, and the business-impact basis for each. The resilience owner shall ensure every RES-02 to RES-05 control and every NET, POW, THM, CMP and STO recovery claim references these tolerances.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E5, E6. Operating states: NORMAL, DEGRADED, EMERGENCY, RECOVERY.

MCF-RES-002 Graceful Degradation

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Supports CG-09, CG-10

Objective. Ensure that partial loss of power, cooling, compute, storage or network capacity results in planned, controlled reduction of AI service (load shedding, job preemption, throttling, reduced replicas) rather than uncontrolled failure.

Requirement and evidence

The resilience owner shall define graceful-degradation modes for each Capability Instance, stating the trigger condition (for example loss of one cooling string, utility loss on UPS autonomy, loss of a fabric plane), the action (power capping, job preemption by priority, checkpoint-and-drain, inference replica reduction, admission control), the owner of the decision and the expected residual capacity. The platform operations lead shall implement the actions as tested automation or procedures and shall demonstrate by test or analysed event that each mode achieves the expected residual capacity within the time available before the triggering constraint is exceeded.

Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: DEGRADED, EMERGENCY, TRANSITION.

MCF-RES-003 Resilience Scenarios

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-09, CG-10, CG-03

Objective. Ensure a maintained library of credible single, compound and common-mode scenarios is used to design and test resilience, including the AIDCF-004 cross-domain scenarios relevant to the site.

Requirement and evidence

The resilience owner shall maintain a scenario library for each site and Capability Instance that includes, at minimum, the applicable AIDCF-004 cross-domain scenarios (X01 to X20), site-specific hazards, and maintenance-induced and recovery-induced scenarios; each scenario shall have an initiating event, initial operating state, propagation path, safeguards, residual capability and recovery path. The resilience owner shall prioritise scenarios using the AIDCF-004 prioritisation criteria and shall review the library annually and after major incidents.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E5, E6. Operating states: NORMAL, DEGRADED, MAINTENANCE, EMERGENCY, RECOVERY, TRANSITION.

MCF-RES-004 Resilience Ownership

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-13

Objective. Ensure resilience of each Capability Instance has a single accountable owner with authority across facility, IT and provider boundaries and that resilience responsibilities are explicit for every contributing domain.

Requirement and evidence

The executive sponsor shall appoint an accountable resilience owner for each site or Capability Instance with authority to set resilience requirements, approve accepted limitations and direct cross-domain testing. The resilience owner shall maintain a resilience responsibility matrix naming the responsible owner for power, cooling, network, compute, storage, control-plane and provider elements of each resilience and recovery capability, including colocation and cloud provider responsibilities.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E5, E6. Operating states: NORMAL, EMERGENCY, RECOVERY.

RES-02 Fault-domain and containment design

MCF-RES-005 Fault-Domain Definition

Claim implementationAssurance level AL3Tier CP-2Evidence floor S4Critical to CG-09Supports CG-03, CG-02

Objective. Ensure the site-level fault-domain model (power, cooling, fire, water, network, compute, storage and control-plane domains) is defined and reconciled to the as-built infrastructure, so that redundancy and independence claims are traceable.

Requirement and evidence

The resilience owner shall maintain a site fault-domain model that defines each fault domain (for example electrical distribution paths, UPS systems, cooling strings and CDU groups, fire compartments, water zones, network planes, compute pods, storage failure domains, control-plane clusters) with its members, and records which domains overlap. The resilience owner shall reconcile the model to as-built evidence (single-line diagrams, P&IDs, rack power and cooling mapping, fabric topology, scheduler and storage placement) at commissioning and after material change, and shall flag every redundancy claim whose members share a fault domain.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational. Optional: E5, E6. Operating states: NORMAL, MAINTENANCE, DEGRADED.

MCF-RES-006 Containment Boundaries

Claim implementationAssurance level AL3Tier CP-2Evidence floor S4Supports CG-09

Objective. Ensure physical, electrical, thermal, network and logical boundaries that are intended to stop propagation are implemented as designed, with their isolating devices identified and maintained.

Requirement and evidence

The resilience owner shall identify each containment boundary relied upon (for example fire compartment, electrical protection discrimination point, cooling-loop isolation valves, fabric partition, security zone, scheduler placement constraint, storage failure domain) together with the isolating device or mechanism and its required response. The domain owners shall confirm that each mechanism is installed, configured and maintained as designed and shall record mechanisms in bypass or override as temporary configurations under OPS-019.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational. Optional: E5, E6. Operating states: NORMAL, MAINTENANCE, DEGRADED.

MCF-RES-007 Blast Radius

Claim implementationAssurance level AL3Tier CP-2Evidence floor S4Critical to CG-09Supports CG-03

Objective. Ensure the maximum consequence of each credible failure is quantified in capability terms (accelerators, jobs, tenants, inference capacity, data) and compared with the impact tolerance.

Requirement and evidence

The resilience owner shall perform and maintain a blast-radius analysis for each prioritised scenario and each fault domain, stating the affected assets, the affected Capability Instances, the capability consequence in outcome units and comparison with impact tolerance, including common-cause and common-mode failures (for example firmware rollout, shared controller, shared identity provider). The resilience owner shall record every blast radius exceeding tolerance as a Finding with a treatment plan or approved limitation.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E7 Derived and analytical. Optional: E3, E4, E5. Operating states: NORMAL, DEGRADED, MAINTENANCE, FAILED.

MCF-RES-008 Isolation Validation

Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-09Supports CG-04

Objective. Ensure containment boundaries actually stop propagation when demanded, verified by representative tests, analysed incidents or safe simulations.

Requirement and evidence

The resilience owner shall maintain an isolation validation plan that assigns a validation method from the AIDCF-004 safe validation hierarchy (V0–V7) to each containment boundary, with the highest safe level for gate-critical boundaries, and shall execute the plan over a defined cycle. The domain owners shall record results, including failed or partial isolation, and shall retest after remediation.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: NORMAL, DEGRADED, MAINTENANCE, FAILED, EMERGENCY.

RES-03 Continuity planning

MCF-RES-009 Continuity Strategy

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-10, CG-01

Objective. Ensure an approved continuity strategy states how each Capability Instance's minimum outcome will be sustained or resumed across site loss, provider loss and major infrastructure loss.

Requirement and evidence

The resilience owner shall maintain an approved continuity strategy for each Capability Instance that selects and justifies the continuity approach (for example in-site redundancy, active-active multi-site inference, warm standby training capacity, checkpoint replication to an alternate site, contracted cloud burst, or accepted suspension), states the dependencies of the chosen approach, and is consistent with the impact tolerances in RES-001.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E5, E6. Operating states: EMERGENCY, FAILED, RECOVERY.

MCF-RES-010 Alternative Capacity

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Supports CG-10, CG-03

Objective. Ensure alternate compute, storage and network capacity relied upon by the continuity strategy exists, is compatible and can be brought into service within tolerance.

Requirement and evidence

The capability owner shall identify the alternate capacity relied upon (alternate cluster, partitioned reserve, alternate site, cloud contract) with its size, compatibility (accelerator generation, software stack, fabric, storage access) and activation time, and shall secure it by reservation or contract. The platform operations lead shall demonstrate by test at a defined interval that a representative workload can be relocated to alternate capacity and resumed from checkpoint or served within the activation time.

Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: EMERGENCY, RECOVERY, FAILED.

MCF-RES-011 Site and Provider Continuity

Claim implementationAssurance level AL3Tier CP-2Evidence floor S3Supports CG-03, CG-10

Objective. Ensure the continuity arrangements of sites, colocation operators, utilities, carriers and critical service providers are known, evidenced and compatible with the Capability Instance's tolerances.

Requirement and evidence

The resilience owner shall obtain, for each site operator and critical provider (colocation, utility, carrier, cloud, OEM support), evidence of their continuity arrangements relevant to the outcome (for example operator emergency response, fuel contracts, carrier restoration commitments, provider recovery objectives), and shall reconcile provider objectives with the Capability Instance's tolerances. The resilience owner shall record every mismatch as a dependency limitation.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E5 Independent and third-party. Optional: E3, E6. Operating states: EMERGENCY, FAILED, RECOVERY.

MCF-RES-012 Crisis Priorities

Claim designAssurance level AL2Tier CP-1Evidence floor S3Supports CG-10, CG-01

Objective. Ensure pre-agreed restoration and allocation priorities exist for when capacity is scarce, so that crisis decisions on which workloads, tenants and services are protected or restored first are not improvised.

Requirement and evidence

The capability owner shall approve a priority scheme stating, for scarce power, cooling, compute and network capacity during DEGRADED, EMERGENCY and RECOVERY states, which workloads, tenants and services are protected, preempted and restored first, consistent with contractual commitments and life-safety precedence. The platform operations lead shall implement the scheme in scheduler priority classes and runbooks.

Evidence required: E1 Documentary and declarative; E7 Derived and analytical. Optional: E5, E6. Operating states: DEGRADED, EMERGENCY, RECOVERY.

RES-04 Recovery planning

MCF-RES-013 Recovery Dependencies

Claim implementationAssurance level AL3Tier CP-2Evidence floor S5Critical to CG-10Supports CG-03

Objective. Ensure every prerequisite for recovering each Capability Instance (power, cooling, network, time, identity, DNS, storage metadata, controllers, images, licences, people and providers) is identified, including circular and cold-start dependencies.

Requirement and evidence

The recovery manager shall maintain a recovery dependency map for each Capability Instance, derived from DEP-004, listing every prerequisite system, service, credential, artefact, person and provider required to restore the outcome from a cold or failed state, and shall identify circular dependencies (for example identity provider hosted on the cluster it unlocks, DNS required to reach the time source, BMC firmware repository on the failed storage) and the means by which each is broken. The recovery manager shall verify the map against the last integrated recovery test.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational. Optional: E5, E6. Operating states: FAILED, RECOVERY, SHUTDOWN, EMERGENCY.

MCF-RES-014 Recovery Sequencing

Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-10Supports CG-05, CG-06

Objective. Ensure a tested, ordered restoration sequence exists from total or partial loss through power, cooling, network, storage, compute and control plane to validated service, with hold points and safety checks between stages.

Requirement and evidence

The recovery manager shall maintain a black-start and restoration sequence for each site and Capability Instance that orders restoration through power (utility or generation, distribution, UPS), cooling (heat rejection, facility water, CDUs and liquid loops before IT load), out-of-band and core network, time and identity services, storage (metadata and quorum before data services), compute (BMC, firmware validation, health checks, burn-in) and AI control plane (cluster manager, scheduler), with entry criteria, hold points, load-step limits and safety checks at each stage. The recovery manager shall demonstrate the sequence by integrated test or exercise at a defined interval and shall record achieved stage durations against the recovery time objective.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: SHUTDOWN, FAILED, RECOVERY, TRANSITION, EMERGENCY.

MCF-RES-015 Configuration Restoration

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Supports CG-10, CG-07, CG-14

Objective. Ensure the configuration of infrastructure and control-plane systems can be restored from a known-good, integrity-verified baseline, avoiding reintroduction of corrupt or malicious configuration.

Requirement and evidence

The recovery manager shall ensure that configuration backups of network devices, controllers, BMS/EPMS, CDU controllers, storage controllers, cluster managers and identity systems are taken at a defined interval, are integrity-protected (hashed or signed), are stored outside the failure and compromise domain they protect, and are tagged with the approved baseline they correspond to. The recovery manager shall test restoration of a sample of each system class at a defined interval, including verification that the restored configuration matches the approved baseline and not a compromised or drifted state.

Evidence required: E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: RECOVERY, FAILED, MAINTENANCE.

MCF-RES-016 Data and Checkpoint Recovery

Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-10Supports CG-08

Objective. Ensure training state (checkpoints, optimiser state, data-loader position), model artefacts and essential datasets can be recovered within the recovery point and time objectives and that restarted jobs resume correctly.

Requirement and evidence

The capability owner shall set a checkpoint policy per training Capability Instance stating checkpoint interval (justified against failure rate, checkpoint cost and maximum lost work, for example using a Young/Daly-style optimisation), checkpoint retention, and the number and placement of durable copies outside the training cluster's failure domain. The platform operations lead shall verify checkpoint integrity at write and before restore, and shall test at a defined interval that a representative job can be restarted from checkpoint (including on a different set of nodes) and reaches equivalent training state within RTO and lost-work tolerance.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: NORMAL, FAILED, RECOVERY, DEGRADED.

RES-05 Testing and exercising

MCF-RES-017 Component Tests

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-10, CG-05, CG-06

Objective. Ensure resilience-relevant components (generators, UPS, transfer switches, CDU pumps, valves, fabric failover, controller failover, storage failover) are functionally tested on a defined programme and results tracked.

Requirement and evidence

The resilience owner shall maintain a component test programme listing each resilience-relevant component class, the test method, frequency and acceptance criteria, coordinated with domain maintenance programmes. Domain owners shall execute tests per programme, record results, and raise and close defects; the resilience owner shall review programme adherence quarterly.

Evidence required: E3 Operational and observational; E4 Validation and test. Optional: E1, E2. Operating states: NORMAL, MAINTENANCE.

MCF-RES-018 Integrated Scenario Tests

Claim resilienceAssurance level AL5Tier CP-5Evidence floor S5Critical to CG-10Supports CG-09, CG-05, CG-06

Objective. Ensure prioritised cross-domain scenarios are exercised as integrated tests across power, cooling, network, compute, storage and control plane, demonstrating that the Capability Instance stays within or recovers within tolerance.

Requirement and evidence

The resilience owner shall plan and execute integrated scenario tests for prioritised scenarios from RES-003 (for example utility loss with generator start and UPS transfer under AI load, cooling string loss at sustained load, fabric plane loss during checkpoint, control-plane loss), measuring capability-level outcomes (job survival, lost work, inference availability, restoration time) as well as system behaviour. The resilience owner shall define test objectives, safety case, abort criteria and success criteria tied to impact tolerances before each test and shall record results and defects.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational; E4 Validation and test. Optional: E5, E7. Operating states: NORMAL, DEGRADED, EMERGENCY, FAILED, RECOVERY, TRANSITION.

MCF-RES-019 Tabletop Exercises

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-10, CG-13

Objective. Ensure decision-makers, operators and providers rehearse response to scenarios that cannot safely be tested live, including cyber-physical, compound and site-loss events.

Requirement and evidence

The resilience owner shall run tabletop exercises on a defined cycle covering scenarios not testable live, including at least one cyber-physical scenario (for example BMS/EPMS compromise, X05) and one compound event (X20) per cycle, with participation of crisis command, facility, IT, security and key providers. The resilience owner shall record decisions, timings, gaps and actions and shall track actions to closure.

Evidence required: E3 Operational and observational; E6 Human and experiential. Optional: E1, E4. Operating states: EMERGENCY, RECOVERY, FAILED.

MCF-RES-020 Lessons and Retest

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-10, CG-14

Objective. Ensure that defects and lessons from tests, exercises and real incidents are tracked to closure, reflected in plans and designs, and verified by retest.

Requirement and evidence

The resilience owner shall maintain a lessons register capturing every defect and lesson from tests, exercises and incidents with owner, due date, and the plan, runbook, design or control affected. The resilience owner shall require retest or equivalent verification before closure of any lesson affecting a gate-critical safeguard and shall report overdue items to governance monthly.

Evidence required: E1 Documentary and declarative; E3 Operational and observational. Optional: E4, E7. Operating states: NORMAL, RECOVERY.

RES-06 Crisis and adaptive response

MCF-RES-021 Crisis Command

Claim effectivenessAssurance level AL5Tier CP-4Evidence floor S4Supports CG-13, CG-10

Objective. Ensure a crisis command structure with defined levels, authority, activation criteria and facilities can take timely decisions during major infrastructure and cyber-physical events.

Requirement and evidence

The executive sponsor shall establish a crisis command structure with strategic, tactical and operational levels, named primary and alternate role holders, activation criteria, decision authority (including authority to shed load, suspend tenants, invoke alternate capacity and order controlled shutdown), and command facilities and communication channels that remain available when site systems, corporate identity or primary communications fail. The crisis management lead shall demonstrate activation and decision timings in exercises or real events.

Evidence required: E1 Documentary and declarative; E3 Operational and observational; E4 Validation and test; E6 Human and experiential. Optional: E5. Operating states: EMERGENCY, FAILED, RECOVERY.

MCF-RES-022 Stakeholder Communications

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-13

Objective. Ensure timely, accurate communication to customers, tenants, regulators, providers and staff during disruption, consistent with contractual and regulatory notification obligations.

Requirement and evidence

The crisis management lead shall maintain a communications plan listing stakeholders, notification obligations and deadlines (contractual and regulatory), approved message templates, approval authority and channels that remain available during site and identity failures. The crisis management lead shall record each notification issued during events and exercises with timestamp and approver and shall review timeliness against obligations.

Evidence required: E1 Documentary and declarative; E3 Operational and observational. Optional: E6. Operating states: EMERGENCY, RECOVERY.

MCF-RES-023 Emergency Change

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-14

Objective. Ensure changes made under emergency conditions are authorised by defined emergency authority, minimal, recorded, and reconciled back to baseline after the event.

Requirement and evidence

The change authority shall define an emergency change procedure stating who may authorise emergency changes to infrastructure, OT and control-plane systems, the minimum record to be captured at the time, and the deadline for retrospective review. The recovery manager shall ensure every emergency change is retrospectively reviewed, either reverted or formalised, and that baselines and evidence are updated, and shall report unreconciled emergency changes.

Evidence required: E1 Documentary and declarative; E2 Configuration and technical state; E3 Operational and observational. Optional: E6. Operating states: EMERGENCY, RECOVERY.

MCF-RES-024 Post-Event Adaptation

Claim operationAssurance level AL4Tier CP-3Evidence floor S3Supports CG-14

Objective. Ensure that after material events the organisation analyses root causes and systemic contributors, adapts design, operations and assurance, and triggers reassessment of affected claims.

Requirement and evidence

The resilience owner shall require a post-event review within a defined time after every material event, covering timeline, root and contributing causes, safeguard performance against expectation, recovery performance against tolerance, and required adaptations to design, operations, controls and evidence. The resilience owner shall raise reassessment triggers for affected controls and gate results and shall track adaptations to completion.

Evidence required: E1 Documentary and declarative; E3 Operational and observational; E7 Derived and analytical. Optional: E6. Operating states: RECOVERY, NORMAL.

Source: controls.csv, evidence-profiles.csv and gate-mappings.csv.